Construction of Cabicungan Flood Control Structure, Sta. 13 + 580 - Sta. 13 + 605 (L/S), Sta 13+180-Sta 13+280 (L/S), Sta 13+460-Sta 13+510 (R/S), Sta 13+230-Sta 13+430 (R/S), Calanasan, Apayao
Construction of Cabicungan Flood Control Structure, Sta. 13 + 580 - Sta. 13 + 605 (L/S), Sta 13+180-Sta 13+280 (L/S), Sta 13+460-Sta 13+510 (R/S), Sta 13+230-Sta 13+430 (R/S), Calanasan, Apayao is a DPWH-tracked public work in APAYAO, Cordillera Administrative Region. Reported contract value: ₱47,521,251.30. Status: Reported complete (DPWH). Contractor on record: ASC CONST & CONCRETE PRODUCTS. Figures trace to sumbong.
Total Contract Cost





