ASC CONST & CONCRETE PRODUCTS is listed as a company organization in Philippine public procurement records on this site, with 21 linked DPWH project(s) totaling about ₱1,291,797,873.68. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ASC CONST & CONCRETE PRODUCTS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 21
- Total value
- ₱1,291,797,873.68
- Published flags
- 2
- Region
- APAYAO · Cordillera Administrative Region
Licensed officers (PCAB)
- Abraham S. Collado · Authorized Managing Officer (PCAB license 26788) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ASC CONST & CONCRETE PRODUCTS — not an accusation or finding of wrongdoing.
Score: 81.70 / 100 · Projects in sample: 21 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.8/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 73.8
- lateCompletedProjects
- 11
- onTimeCompletedProjects
- 10
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 21
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 21
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 21
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 97.1/100 · Weight: 11%
- projects
- 21
- componentScore
- 97.1
- flagsPerProject
- 0.1
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 21
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
21 geotagged projects — Open full map · Download projects (CSV)
- Construction of Flood Control Structure along Apayao River Basin, Barangay San Sebastian, Luna, Apayao23PC0040 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - APAYAO (CALANASAN) - ILOCOS NORTE RD - (S00644LZ) CHAINAGE 4571-CHAINAGE 657123PC0001 · ₱96,500,000.00 · mapped
- Construction of Apayao-Abulug River Basin Flood Control Structure, Barocboc Section, Sta. 19 + 657 - Sta. 20 + 135 (L/S), Sta. Marcela, Apayao23PC0027 · ₱96,483,381.66 · mapped
- Cagayan River Flood Management Projects, Natappian, Solana, Cagayan22BD0089 · ₱93,002,840.00 · mapped
- Construction of Poblacion Flood Control Structure along Apayao River, Sta. 136 + 247.68 - Sta. 136 + 752.68 (L/S), Calanasan, Apayao21PC0018 · ₱92,692,943.80 · mapped
- Construction of Apayao - Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24 + 384 - Sta. 24 + 884 (L/S), Sta. Marcela, Apayao23PC0034 · ₱83,452,531.58 · mapped
- Construction of Nabuangan (Upstream) Flood Control, Sta. 38 + 997 - Sta. 39 + 447 (B/S), Brgy. Caglayan, Conner, Apayao21PB0013 · ₱80,309,010.27 · mapped
- Construction of Pamplona River Basin Flood Control Structure, Marag Section, Sta 27+562-Sta 27+762 (LS), Sta. 27+960-Sta. 28+460 (LS), Luna, Apayao22PC0056 · ₱79,564,241.95 · mapped
- Construction of Apayao-Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24+884-Sta. 25+380 (LS), Sta. Marcela, Apayao22PC0007 · ₱77,189,689.42 · mapped
- Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 938 (L/S), Barangay Malama, Conner, Apayao23PB0009 · ₱72,375,000.00 · mapped
- Construction of Barren River (Downstream) Flood Control Structure, Sta. 39+033 - Sta. 39+693 (L/S), Brgy. Malama, Conner, Apayao22PB0010 · ₱51,762,600.00 · mapped
- Construction of Cabicungan River Basin Flood Control Structure, Dappay Section, Sta. 11 + 470 - Sta. 12 + 090 (R/S), Calanasan, Apayao22PC0034 · ₱49,000,000.00 · mapped
- Reconstruction of Dugo Flood Control Structure along Abulug River, Dugo, Banguian, Abulug, Cagayan Sta. 9+820 -Sta. 9+970 (R/S)21BC0140 · ₱49,000,000.00 · mapped
- Construction of Cabicungan Flood Control Structure, Sta. 13 + 580 - Sta. 13 + 605 (L/S), Sta 13+180-Sta 13+280 (L/S), Sta 13+460-Sta 13+510 (R/S), Sta 13+230-Sta 13+430 (R/S), Calanasan, Apayao21PC0019 · ₱47,521,251.30 · mapped
- Construction of Sta. Filomena Flood Control Structure, Sta. 0 + 440 - Sta. 1 + 400, Calanasan, Apayao22PC0068 · ₱47,169,843.01 · mapped
- Construction of Sipa-San Mariano Flood Control Structure along Apayao River, Sta. 25 + 380 - Sta. 25 + 700 (L/S), Sta. Marcela, Apayao21PC0010 · ₱45,942,583.67 · mapped
- Construction of Drainage System Outfall - Balzain Creek to Pinacanauan River - Package 1, Tuguegarao City, Cagayan21BD0076 · ₱41,495,798.75 · mapped
- Construction of Nabuangan River (Upstream) Flood Control, Sta. 37 + 807 - Sta. 38 + 267 (L/S), Sitio Paddig, Brgy. Caglayan, Conner, Apayao21PB0004 · ₱38,292,917.46 · mapped
- Cagayan River Flood Management Project, Andarayan, Solana, Cagayan23BD0019 · ₱29,400,000.00 · mapped
- Construction of Calabigan Flood Control Structure, Barangay Calabigan, Luna, Apayao23PC0066 · ₱14,243,240.81 · mapped
- Construction of Sta. Filomena Floodway/ Flood Control Structure, Sta. Filomena, Calanasan, Apayao21PC0067 · ₱9,900,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 26788
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jun 29, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 26788); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
47 evaluations listed across 6 GPPB CPES releases; average final rating 89.7% over 25 rated projects; 45 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 22, 2026 | NIA | ₱14,488,217.00 | On-going | 91.9% | — | 41st, p. 2 |
| Mar 22, 2026 | NIA | ₱28,772,556.00 | On-going | 87.8% | — | 41st, p. 2 |
| Mar 16, 2026 | NIA | ₱159,965,839.00 | On-going | 84.3% | — | 41st, p. 2 |
| Mar 16, 2026 | NIA | ₱176,967,182.00 | On-going | 85.6% | — | 41st, p. 2 |
| Mar 16, 2026 | NIA | ₱147,239,898.00 | On-going | 89.4% | — | 41st, p. 2 |
| Mar 16, 2026 | NIA | ₱117,838,460.00 | On-going | 89.6% | — | 41st, p. 2 |
| Mar 16, 2026 | NIA | ₱217,583,182.00 | On-going | 84.9% | — | 41st, p. 2 |
| Feb 16, 2026 | NIA | ₱135,560,752.00 | On-going | 90.3% | — | 41st, p. 2 |
| Nov 10, 2025 | NIA | ₱47,451,426.00 | On-going | 89.1% | — | 41st, p. 2 |
| Nov 9, 2025 | NIA | ₱58,048,847.00 | Completed | 93.0% | 93.0% | 40th, p. 41 |
| Sep 22, 2025 | NIA (JV) | ₱98,294,772.00 | Completed | 88.0% | 88.0% | 40th, p. 42 |
| Aug 6, 2025 | NIA | ₱184,793,396.00 | On-going | 83.2% | — | 40th, p. 41 |
Showing the 12 most recent of 47.
2 amounts flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →