CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PHASE 4, BRGY. CALUMPANG, NAVAL, BILIRAN (124.421176°, 11.580012° - 124.421449°, 11.582189°)
CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PHASE 4, BRGY. CALUMPANG, NAVAL, BILIRAN (124.421176°, 11.580012° - 124.421449°, 11.582189°) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱23,464,968.95. Status: Reported complete (DPWH). Contractor on record: ROVING PREMIER CONTRACTORS INC. Figures trace to dpwh.
Total Contract Cost
