ROVING PREMIER CONTRACTORS INC is listed as a company organization in Philippine public procurement records on this site, with 48 linked DPWH project(s) totaling about ₱1,015,019,046.15. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ROVING PREMIER CONTRACTORS INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 48
- Total value
- ₱1,015,019,046.15
- Published flags
- 3
- Region
- Biliran DEO · Region VIII
Public Record Grade
A transparent, data-derived summary of reported public records for ROVING PREMIER CONTRACTORS INC — not an accusation or finding of wrongdoing.
Score: 77.40 / 100 · Projects in sample: 48 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 56.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 56.1
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 31
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 45
- pastTargetOngoingProjects
- 12
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 48
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 48
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.8/100 · Weight: 11%
- projects
- 48
- componentScore
- 98.8
- flagsPerProject
- 0.04
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 48
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
47 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF CARAYCARAY FLOOD CONTROL STRUCTURE ALONG BILIRA CIRCUMFERENTIAL ROAD, PHASE VII, NAVAL, BILIRAN25IA0133 · ₱86,835,605.00 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1092+932 -K1094+70025IA0069 · ₱81,998,593.88 · mapped
- Construction of Flood Control Structure, Brgy. Canila Phase II, Biliran, Biliran23IA0066 · ₱47,902,300.70 · mapped
- Rehabilitation of Anas Flood Control along Biliran Circumferential Road, Phase II, Naval, Biliran23IA0009 · ₱39,156,323.62 · mapped
- Construction of Calambis Flood Control along Biliran Circumferential Road Phase IV, Caibiran, Biliran23IA0067 · ₱34,280,548.95 · mapped
- REHABILITATION OF ROAD, PHASE 2, SITIO DAPDAP TO LARRAZABAL, NAVAL, BILIRAN25IA0168 · ₱29,150,725.00
- CONSTRUCTION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, CABUCGAYAN, BILIRAN21IA0017 · ₱28,730,805.75 · mapped
- Repair/ Rehabilitation of Flood Control Structures Damaged by Typhoon "Odette" Catmon Flood Control , Brgy. Catmon, Naval, Biliran22IA0130 · ₱28,564,526.52 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO LOMBOY, PHASE 5, BARANGAY CALUMPANG, NAVAL, BILIRAN22IA0076 · ₱28,078,872.05 · mapped
- REHABILITATION OF SANTOL FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, (PHASE 4) BILIRAN, BILIRAN (124.47218, 11. 48019 - 124.47273, 11.48095)20IA0007 · ₱27,905,200.00 · mapped
- CONCRETING OF BRGY. MAPUYO TO PALAYAN NG BAYAN FMR PHASE II, BRGY. MAPUYO20IA0070 · ₱24,205,350.00 · mapped
- Construction of Flood Control Structure, Barangay Pinangomhan, Biliran, Biliran22IA0107 · ₱23,741,640.60 · mapped
- REHABILITATION OF ANAS FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, NAVAL, BILIRAN (124.395634, 11.578957 - 124.396044, 11.578352)22IA0081 · ₱23,619,927.60 · mapped
- CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PHASE 4, BRGY. CALUMPANG, NAVAL, BILIRAN (124.421176°, 11.580012° - 124.421449°, 11.582189°)22IA0075 · ₱23,464,968.95 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO IMELDA FALLS, NAVAL, BILIRAN (11.606762°, 124.456082° - 11.608592°, 124.46051°)22IA0063 · ₱23,452,188.55 · mapped
- CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PHASE 3, BRGY. CALUMPANG, NAVAL, BILIRAN (124.421450°, 11.579586° - 124.421296°, 11.580385°)22IA0074 · ₱23,442,638.25 · mapped
- REHABILITATION OF UNGALI FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 3, KAWAYAN, BILIRAN (124.455185°, 11.698469° - 124.455855°, 11.697316°)22IA0026 · ₱23,423,277.50 · mapped
- CONSTRUCTION OF ROAD, SITIO LOMBOY TO P.S. EAMIGUEL, NAVAL, BILIRAN23IA0087 · ₱19,783,930.43 · mapped
- CONSTRUCTION OF MAINIT FLOOD CONTROL, PHASE VI, CAIBIRAN, BILIRAN25IA0089 · ₱19,590,909.56 · mapped
- Construction of Mapula Flood Control along Biliran Circumferential Road, Phase 2, Downstream, Caibiran, Biliran23IA0088 · ₱19,590,695.22 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD - K1076+600 - K1077+12025IA0074 · ₱19,588,910.35 · mapped
- CONSTRUCTION OF FLOOD CONTROL, SITIO LOMBOY, BRGY. CALUMPANG, NAVAL, BILIRAN20IA0069 · ₱19,414,720.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, BARANGAY SAN LORENZO, KAWAYAN, BILIRAN24IA0090 · ₱19,275,510.80 · mapped
- REHABILITATION OF MAPUYO FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD20IA0050 · ₱19,170,470.00 · mapped
- ACCESS ROAD LEADING TO ANISLAGAN HOT SPRING (11.530398°, 124.445554° - 11.530506°, 124.44489°, 11.531096°, 124.4441° - 11.530734°, 124.444567°)22IA0073 · ₱18,895,898.85 · mapped
- CONSTRUCTION OF CANILA FLOOD CONTROL, BRGY. CANILA, BILIRAN, BILIRAN (124.487267°, 11.496516° - 124.488393°, 11.497887°)22IA0035 · ₱18,781,654.95 · mapped
- REHABILITATION OF MAPULA FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.55056, 11.57448 -124.550796, 11.57443)20IA0011 · ₱18,621,600.00 · mapped
- CONSTRUCTION OF KAULANGOHAN FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, CAIBIRAN, BILIRAN (124.55511, 11. 58941 - , 124.55193, 11.58873)20IA0006 · ₱18,605,460.00 · mapped
- CONSTRUCTION OF UNGALI FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, KAWAYAN, BILIRAN (124.456314°, 11.701943° - 124.45551°, 11.704202°)22IA0018 · ₱18,604,446.40 · mapped
- CONCRETING OF BRGY. TUCDAO FMR (PHASE II) BRGY. TUCDAO, KAWAYAN, BILIRAN25IA0127 · ₱14,918,260.70 · mapped
- REHABILITATION OF ROAD, SITIO ALANG-ALANG, BARANGAY LUCSOON, NAVAL, BILIRAN25IA0158 · ₱14,805,980.50 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO BURI, BARANGAY UNGALI, KAWAYAN, BILIRAN25IA0034 · ₱14,680,805.74 · mapped
- CONSTRUCTION OF ROAD, SITIO ANAS, BARANGAY UNGALI, KAWAYAN, BILIRAN25IA0041 · ₱14,675,110.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY VILLA CORNEJO, KAWAYAN, BILIRAN25IA0020 · ₱14,625,449.76 · mapped
- Construction of Flood Control Structure, Barangay Inasuyan, Kawayan, Biliran24IA0004 · ₱14,546,001.04 · mapped
- CONCRETING OF BRGY. INASUYAN FMR (PHASE II) STA.0+000 TO STA.0+680 (11.690506, 124.483041 TO 11.68522IA0101 · ₱11,514,772.65 · mapped
- Construction of Flood Control Structure, Barangay San Lorenzo, Kawayan, Biliran23IA0010 · ₱9,896,464.35 · mapped
- Construction of Flood Control Structure, Sitio Buri, Barangay Ungale, Kawayan, Biliran23IA0011 · ₱9,894,399.28 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY INASUYAN, KAWAYAN, BILIRAN25IA0043 · ₱9,860,510.75 · mapped
- CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL IN BARANGAY CALUMPANG, NAVAL, BILIRAN21IA0062 · ₱9,643,107.60 · mapped
- CONSTRUCTION OF FLOOD CONTROL, SO. LOMBOY, BARANGAY CALUMPANG, NAVAL, BILIRAN21IA0059 · ₱9,583,905.50 · mapped
- CONSTRUCTION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (CABUCGAYAN - BILIRAN SECTION) 124.564297, 11480228 TO 124.563250, 11.481719), CABUCGAYAN, PROVINCE OF BILIRAN21IA0030 · ₱9,566,535.75 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD, BARANGAY TABUNAN NORTH - SITIO TADLOY, BRGY. MASAGONGSONG, KAWAYAN (FROM 11.65544, 124.362861 TO 11.659503, 124.3635998), KAWAYAN, BILIRAN PROVINCE21IA0049 · ₱7,715,515.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO ILAWOD, BARANGAY CARAYCARAY, NAVAL, BILIRAN25IA0073 · ₱4,940,908.75 · mapped
- Construction of Flood Control in Brgy. San Lorenzo, Kawayan, Biliran23IA0100 · ₱4,823,823.95 · mapped
- CONSTRUCTION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (CABUCGAYAN - BILIRAN SECTION) 124.563250, 11.481719 TO 124.563075, 1.483220), CABUCGAYAN, PROVINCE OF BILIRAN21IA0032 · ₱4,785,680.25 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO LOMBOY, PHASE I, BARANGAY CALUMPANG, NAVAL, BILIRAN (124.413508°, 11.573891° - 124.414298°, 11.573994°)21IA0060 · ₱4,738,995.10 · mapped
- CONSTRUCTION/REHABILITATION OF ROAD LEADING TO UNGALI ELEMENTARY SCHOOL II20IA0074 · ₱1,925,120.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 54 awards · ₱1,178,338,617.26
- 25IA0168₱29,150,725.00· 2025-08-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- CID No. 24I00385₱5,327,608.56· 2025-06-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION VIII
- 25IA0133₱86,835,605.00· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0069₱81,998,593.88· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0127₱14,918,260.70· 2025-03-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0074₱19,588,910.35· 2025-02-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0089₱19,590,705.75· 2025-02-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0073
- 25IA0020₱14,625,449.76· 2025-02-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0043
- 25IA0041₱14,675,110.00· 2025-02-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0034₱14,680,805.74· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 25IA0158₱14,805,980.50· 2025-01-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0143₱19,268,725.00· 2024-12-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0144₱24,098,905.50· 2024-12-04· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0147
- 24IA0120₱14,425,315.70· 2024-04-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0090₱19,275,510.80· 2024-02-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 24IA0004₱14,545,780.60· 2024-01-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- CID No. 23I00185₱4,889,370.45· 2023-11-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION VIII
- 23IA0088₱19,179,225.85· 2023-03-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0087₱19,475,789.25· 2023-03-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BILIRAN ED
- 23IA0100
- 22IA0143
- 22IA0146
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →