CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PHASE 3, BRGY. CALUMPANG, NAVAL, BILIRAN (124.421450°, 11.579586° - 124.421296°, 11.580385°)
CONSTRUCTION OF SITIO LOMBOY FLOOD CONTROL STRUCTURE, PHASE 3, BRGY. CALUMPANG, NAVAL, BILIRAN (124.421450°, 11.579586° - 124.421296°, 11.580385°) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱23,442,638.25. Status: Reported complete (DPWH). Contractor on record: ROVING PREMIER CONTRACTORS INC. Figures trace to dpwh.
Total Contract Cost
