Roads20DD0126

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD AT BARANGAY KAYUMANGGI, LIPA CITY, BATANGAS

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD AT BARANGAY KAYUMANGGI, LIPA CITY, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱4,801,500.00. Status: Reported complete (DPWH). Contractor on record: TONIJON CONST AND DEVELOPMENT INC FORMERLY: TONIJON CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

101 projects · ₱661.0M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINAGBAYANAN, TAYSAN, BATA

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Flood Control Structure, Paninsingin Bridge, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

Construction of Flood Control Structure, Pinagsibaan Bridge 2, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHANADIONG BRIDGE, TAYSAN

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF - CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0151 + 510 - K0151 + 808, K0151 + 815 - K0152 + 940

Batangas 4th DEO, Region IV-A

2022₱22.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD WITH LINE CANAL AT BRGY. CAWONGAN AND POBLACION, PADRE GARCIA, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱19.0M
Reported complete (DPWH)
View all 101 projects →

4. Implementation

Contract Amount

₱4,801,500.00

Progress

Reported complete (DPWH)

Start Date

October 13, 2020

Target End

November 19, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.