OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG CAGAYAN VALLEY ROAD ALIMANAO BRIDGE, BAYO BRIDGE, GAMMAD BRIDGE
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG CAGAYAN VALLEY ROAD ALIMANAO BRIDGE, BAYO BRIDGE, GAMMAD BRIDGE is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱11,255,655.57. Status: Past target date (DPWH On-Going). Contractor on record: DOUBLE J1908 CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

