Flood Control and Drainage16AB0033

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGAE SYSTE, DAMAGED FLOOD CONTROL FACILITIES/STRUCTURES UNDER THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT (LRBFCSP) ALONG POBLACIO DINGRAS STA 1+800 - STA 1+854.40 LEFT BANK

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGAE SYSTE, DAMAGED FLOOD CONTROL FACILITIES/STRUCTURES UNDER THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT (LRBFCSP) ALONG POBLACIO DINGRAS STA 1+800 - STA 1+854.40 LEFT BANK is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱4,826,460.07. Status: Reported complete (DPWH). Contractor on record: BADOC BUILDERS. Figures trace to dpwh.

Ilocos Norte 2nd DEO, Region I
Region: Region I

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Madongan River, Sta. 6+280 to Sta. 6+340 Left Bank
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-16-0038832

₱3,395,952.00 · FY2016

Released to Central Off (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

117 projects · ₱2.4B total · 0 flags

4. Implementation

Contract Amount

₱4,826,460.07

Progress

Reported complete (DPWH)

Start Date

March 28, 2016

Target End

June 10, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.