Water Provision and Storage22PK0083

CAPITAL OUTLAY- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES. VARIOUS LOCATION (TINGLAYAN, LUBUAGAN, PASIL, AND BALBA

CAPITAL OUTLAY- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES. VARIOUS LOCATION (TINGLAYAN, LUBUAGAN, PASIL, AND BALBA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱4,433,301.40. Status: Reported complete (DPWH). Contractor on record: MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES. Figures trace to dpwh.

Upper Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱1,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cagaluan Flood Control, Cagaluan, Pasil, Kalinga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Upper Kalinga DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

38 projects · ₱158.2M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF MANGBA ROAD LEADING TO LGU PABAHAY ROAD, BARANGAY BALONG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱29.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF JANOM SISIM FLOOD CONTROL STA. 179+550 - STA. 179+310 (R.

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF CHINA-AW FLOOD CONTROL STA. 170+790 - 170+970 (R.S.), BAL

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF LINAS-SAYANGAN CREEK FLOOD CONTROL STA. 173+790 - STA. 17

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.0M
Reported complete (DPWH)
No sat.

Construction of Yakyak Mabilong - Malusong Flood Control Structure, Sta. 170+200 - Sta. 170+275 (B.S.), Mabilong and Antonio Canao, Lubuagan, Kalinga

LUBUAGAN (KALINGA), KALINGA, Cordillera Administrative Region

2022₱8.4M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS - MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD (PINUKPUK-ABBUT SECTION), K0523+856-K0523+936, K0528+982-K0528+997, K0529+048-

Lower Kalinga DEO, Cordillera Administrative Region

2020₱6.4M
Reported complete (DPWH)
View all 38 projects →

4. Implementation

Contract Amount

₱4,433,301.40

Progress

Reported complete (DPWH)

Start Date

January 9, 2023

Target End

April 8, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.