Bridges21CA0084

LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL BRIDGES -CONSTRUCTION/REHABILITATION OF SAN JUAN BRIDGE ALONG OLD NATIONAL ROAD, SAMAL, BATAAN

LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL BRIDGES -CONSTRUCTION/REHABILITATION OF SAN JUAN BRIDGE ALONG OLD NATIONAL ROAD, SAMAL, BATAAN is a DPWH-tracked public work in Bataan 1st DEO, Region III. Reported contract value: ₱44,099,999.28. Status: Reported complete (DPWH). Contractor on record: 3-SIDES BUILDERS. Figures trace to dpwh.

Bataan 1st DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/ Rehabilitation/ Improvement of Flood Control Project Along Colo River, San Benito Section, Phase VI-A Dinalupihan, Bataan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Bataan 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

42 projects · ₱631.2M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, B

Pampanga 3rd DEO, Region III

2025₱47.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, BR

Pampanga 3rd DEO, Region III

2025₱47.9M
Ongoing (DPWH-reported)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, (DOWNSTREAM- LEFT BANK) BARANGAY CONSUELO, MACABEBE, PAMP

Pampanga 1st DEO, Region III

2025₱46.5M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, (DOWNSTREAM- RIGHT BANK) BARANGAY CONSUELO, MACABEBE, PAMP

Pampanga 1st DEO, Region III

2025₱46.5M
Reported complete (DPWH)
No sat.

SIPAG-ACCESS ROADS AND/OR BRIDGE/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT/REHABILITATION OF PANDAN BRIDGE, ANGELES CITY

Pampanga 3rd DEO, Region III

2023₱37.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, STA. ISABEL SECTION, PHASE B, DINALUPIHAN, BATAAN

Bataan 1st DEO, Region III

2019₱27.4M
Reported complete (DPWH)
View all 42 projects →

4. Implementation

Contract Amount

₱44,099,999.28

Progress

Reported complete (DPWH)

Start Date

March 8, 2022

Target End

August 20, 2023

5. Audit