CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (CLUSTER 1) A.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM, STA. MONICA, BRGY. MABUHAY, STA. MONICA, SDN B.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM, ALEGRIA NHS, BRGY. ALEGRIA, STA. MONICA, SDN AND 15 LOCATION
CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (CLUSTER 1) A.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM, STA. MONICA, BRGY. MABUHAY, STA. MONICA, SDN B.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM, ALEGRIA NHS, BRGY. ALEGRIA, STA. MONICA, SDN AND 15 LOCATION is a DPWH-tracked public work in Surigao del Norte 1st DEO, Region XIII. Reported contract value: ₱3,265,782.79. Status: Reported complete (DPWH). Contractor on record: TWO J E CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost
