CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, LAOAG RIVER BASIN FC AND SABO PROJECT (LRBFCSP)-REHAB. OF DIKE SYSTEM ALONG PAPA RIVER (ERODED DIKE), LEFT AND RIGHT BANK, BANNA-NUEVA ERA, ILOCOS NORTE
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, LAOAG RIVER BASIN FC AND SABO PROJECT (LRBFCSP)-REHAB. OF DIKE SYSTEM ALONG PAPA RIVER (ERODED DIKE), LEFT AND RIGHT BANK, BANNA-NUEVA ERA, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱10,651,358.69. Status: Reported complete (DPWH). Contractor on record: ZEDIK BUILDERS. Figures trace to dpwh.
Total Contract Cost