CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PONOT DIUT RIVER (DOWNSTREAM) BOTHSIDES, JOSE DALMAN, ZAMBOANGA DEL NORTE.
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PONOT DIUT RIVER (DOWNSTREAM) BOTHSIDES, JOSE DALMAN, ZAMBOANGA DEL NORTE. is a DPWH-tracked public work in Zamboanga del Norte 2nd DEO, Region IX. Reported contract value: ₱30,952,322.41. Status: Reported complete (DPWH). Contractor on record: FFJJ CONST. Figures trace to dpwh.
Total Contract Cost
