Flood Control and Drainage22DF0333

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES,CONSTRUCTION OF FLOOD CONTROL (DRAINAGE SYSTEM) AT SAN RAFAEL 1 TO 4, NOVELETA, CAVITE

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES,CONSTRUCTION OF FLOOD CONTROL (DRAINAGE SYSTEM) AT SAN RAFAEL 1 TO 4, NOVELETA, CAVITE is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱0.00. Status: Past target date (DPWH On-Going). Contractor on record: JTC CRUZ CONST CO INC. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control (Drainage System) at San Rafael 1 to 4, Noveleta, Cavite
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Cavite 1st DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

154 projects · ₱8.5B total · 5 flags

4. Implementation

Contract Amount

₱0.00

Progress

Past target date (DPWH On-Going)

Start Date

March 31, 2022

Target End

May 14, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.