CONSTRUCTION OF NEW PERMANENT ANONGAN BRIDGE SIBUCO ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA ROAD (SO1165M) ZAMBOANGA DEL NORTE, STA. 2117+760.00 TO STA. 2118+060.00 (NET LENGTH: 300.00 LN.M.)
CONSTRUCTION OF NEW PERMANENT ANONGAN BRIDGE SIBUCO ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA ROAD (SO1165M) ZAMBOANGA DEL NORTE, STA. 2117+760.00 TO STA. 2118+060.00 (NET LENGTH: 300.00 LN.M.) is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱50,727,402.62. Status: Reported complete (DPWH). Contractor on record: ROMA CONST. Figures trace to dpwh.
Total Contract Cost
