ROMA CONST is listed as a company organization in Philippine public procurement records on this site, with 47 linked DPWH project(s) totaling about ₱1,855,802,606.07. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ROMA CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 47
- Total value
- ₱1,855,802,606.07
- Published flags
- 0
- Region
- Zambales 1st DEO · Region III
Online presence
Google Maps: Roma Construction & Development CorporationGoogle Maps, 2026-10-22
National Highway, Botolan, 2202 Zambales
Public Record Grade
A transparent, data-derived summary of reported public records for ROMA CONST — not an accusation or finding of wrongdoing.
Score: 80.40 / 100 · Projects in sample: 47 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 78.9
- lateCompletedProjects
- 11
- onTimeCompletedProjects
- 30
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 43
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 74.5/100 · Weight: 24%
- totalProjects
- 47
- componentScore
- 74.5
- terminatedProjects
- 4
- terminationRatePct
- 8.5
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 46
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
28 geotagged projects — Open full map · Download projects (CSV)
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROAD, CAPAS-BOTOLAN ROAD, ZAMBALES 2ND LEGISLATIVE DISTRICT, PROVINCE OF ZAMBALES18C00019 · ₱240,260,146.05 · mapped
- CONST. OF DRAINAGE ALONG TAGUM-PANABO CIRCUMFERENTIAL ROAD, K1459+850-K1462+660, DAVAO DEL NORTE18L00081 · ₱116,243,134.04 · mapped
- CONSTRUCTION OF PUNDAQUIT BRIDGE, SAN ANTONIO, ZAMBALES20CL0047 · ₱95,495,964.33 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), SAN MIGUEL PORT BOULEVARD, SAN ANTONIO, ZAMBALES21CL0066 · ₱91,674,806.65 · mapped
- ROAD WIDENING- SECONDARY ROADS- OLONGAPO- BUGALLON ROAD- K0201+429- K0203+000, K0206+000- K0206+897.50, IBA, ZAMBALES18CL0045 · ₱76,427,108.15 · mapped
- CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, DOWNSTREAM OF KALAW BRIDGE (LEFT SIDE), BARANGAY SAN JOSE, MONKAYO, DAVAO DE ORO24L00061 · ₱71,654,654.90 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY-OLONGAPO-BUGALLON RD - KO176+600-KO179+0017CL0081 · ₱60,684,654.26 · mapped
- CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, MAMBUSAO, CAPIZ16G00122 · ₱59,867,275.45
- NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROADS, OUTSIDE N1 OLONGAPO-BUGALLON ROAD, ZAMBALES 2ND LEGISLATIVE DISTRICT, PROVINCE OF ZAMBALES16C00001 · ₱56,511,349.99 · mapped
- CONSTRUCTION OF NEW PERMANENT ANONGAN BRIDGE SIBUCO ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA ROAD (SO1165M) ZAMBOANGA DEL NORTE, STA. 2117+760.00 TO STA. 2118+060.00 (NET LENGTH: 300.00 LN.M.)16J00023 · ₱50,727,402.62 · mapped
- CONSTRUCTION OF CONCRETE BRIDGE - MONTEVISTA (JCT. MAYAON) - LAAK DIVERSION RD., DAVAO DE ORO22L00052 · ₱49,449,142.41 · mapped
- REHABILITATION/IMPROVEMENT OF ROADS OF SECTION FROM BRGY. CAROLINA, CAN-AVID - BRGY. DAMPIGAN, DOLORES - MASLOG, EASTERN SAMAR15IB0313 · ₱47,392,854.62
- NET DEVT-IMPR/WIDENING OF NATL RDS-TER RDS JCT NATL RD-MIANAY-DUYOC-CALAAN-PANTN RD-K0103+(-)128 ETC16GD0091 · ₱45,838,486.99 · mapped
- CONST. OF RIVER CONTROL (REVETMENT WALL) ALONG AKLAN RIVER, BRGY. TINIGAW, KALIBO, AKLAN16GA0028 · ₱45,740,995.65
- REPAIR/REHAB./IMPROVEMENT OF BORONGAN SEAWALL, BRGY. BAYBAY, BORONGAN CITY, EASTERN SAMAR15IB0301 · ₱42,588,719.86
- OFF- CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY, OLONGAPO- BUGALLON RD. K0210+100- K021117CL0036 · ₱42,505,374.26 · mapped
- CONSTRUCTION OF 1-UNIT 4 STOREY 20 CLASSROOM SB @ ISULAN NHS ISULAN, SULTAN KUDARAT16MF0068 · ₱40,395,210.58 · mapped
- CONST/MAINT OF FLD MIT STRCT & DRAIN SYS, CONST/REHAB OF CADIO FLD CTRL ALONG PANAY RIVER, CAPIZ16GD0078 · ₱32,396,828.26
- CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGES, MARIVELES BRIDGE (BO1591LZ) ALONG MARIVELES-TALAGA BAY ROAD, BATAAN 2ND LEGISLATIVE DISTRICT, PROVINCE OF BATAAN16C00081 · ₱31,319,994.32 · mapped
- CONST. OF SEAWALL ALONG JAIME CARDINAL SIN AVENUE, NEW WASHINGTON, AKLAN17GA0020 · ₱29,398,450.33
- CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM, MAAYON RIVER CONTROL, MAAYON, CAPIZ16GD0083 · ₱29,337,816.94
- CONST. OF RIVER CONTROL ALONG PANAY RIVER BASIN AT BRGY. POBLACION, CUARTERO, CAPIZ, STA. 0+350-STA.17GP0010 · ₱28,801,729.80
- CONSTRUCTION OF BUCAO DIKE DOWNSTREAM (SOUTH APPROACH), BOTOLAN, ZAMBALES18CL0015 · ₱28,513,405.64 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, NAYUM RIVER CONTROL, STA. 0+796- STA. 1+192, STA. CRUZ, ZAMBALES18CL0033 · ₱28,502,244.59 · mapped
- CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS, PANITAN RC(DOWNSTREAM OF PANITAN BRIDGE)16GD0084 · ₱27,604,178.00
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT (BANCAL RIVER UPSTREAM SOUTH APPROACH), BRGY. BANCAL, BOTOLAN, ZAMBALES20CL0004 · ₱26,341,021.94 · mapped
- CONSTRUCTION OF KILING DIKE (UPSTREAM), STA. 0+926- STA.1+565, CABANGAN, ZAMBALES17CL0027 · ₱25,942,945.40
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL, KILING DIKE (UPSTREAM), CADMANG, CABANGAN, ZAMBALES17CL0016 · ₱23,996,923.86
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, KILING DIKE (DOWNSTREAM), SOUTH APPROACH CABANGAN,17CL0028 · ₱23,776,168.27
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, LAUIS RIVER, (DOWNSTREAM) NORTH SIDE, CANDELARIA, ZAMBALES18CL0022 · ₱23,535,950.36 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL WORKS IN TANGUAY RIVER, CABANGAN, ZAMBALES18CL0012 · ₱23,528,829.85 · mapped
- CONST. OF RIVER CONTROL ALONG PANAY RIVER BASIN AT BRGY. POBLACION PROPER, MAMBUSAO, CAPIZ, STA.0+2317GP0011 · ₱23,158,307.37
- CONST. & MAINT. OF BRIDGES ALONG NAT'L RDS. WIDENING OF PERMANENT BRIDGES INCL. RROW-TO MORE THAN 217GA0049 · ₱19,031,278.69 · mapped
- RAISING OF GRADE ALONG PAITE- MACULCOL DIKE, SAN FELIPE SIDE, SAN FELIPE, ZAMBALES18CL0050 · ₱18,829,844.71 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, KILING DIKE DOWNSTREAM, SOUTH APPROACH, CABANGAN, ZAMBALES18CL0031 · ₱18,822,940.54 · mapped
- RAISING OF SLOPE PROTECTION/ FLOOD CONTROL, VEGA- MACULCOL DIKE, UPSTREAM, SAN NARCISO, ZAMBALES18CL0032 · ₱18,820,234.65 · mapped
- CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-PONTEVEDRA RC (UPSTREAM OF AGBALO BR.)15GD0105 · ₱18,799,308.26 · mapped
- CONST/UPGRADING/REHAB OF DRAINAGE ALONG NAT'L RD-ROXAS CITY BDRY-PANITAN-BAILAN ROAD15GD0100 · ₱18,740,000.00 · mapped
- CONS/MAIN OF FL MIT STR & DRA SYS CON/UPGR OF RVR CONT SYS, PONTEVEDRA RVR CONT(UPSTR OF AGBALO BR)16GD0100 · ₱18,554,218.00
- CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-MAGUBILAN RIVER CONTROL, PANAY, CAPIZ15GD0108 · ₱18,268,847.76 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, BANCAL RIVER (UPSTREAM), IBA, ZAMBALES15CL0081 · ₱17,359,141.82
- CONST. OF MIANAY BRIDGE (NEW) ALONG ILOILO - CAPIZ (NEW ROUTE) COMPLETION16G00037 · ₱13,493,897.10
- CONTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL OF KILING DIKE, (UPSTREAM SECTION), CABANGAN, ZAMBALE15CL0065 · ₱11,997,396.54
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL OF KILING DIKE, (DOWNSTREAM SECTION), CABANGAN, ZAMB15CL0066 · ₱11,547,291.19
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL AT BUCAO DIKE, BOTOLAN, ZAMBALES15CL0063 · ₱11,483,739.04 · mapped
- CONSTRUCTION OF 2 UNITS OF 2 STY 6 CLR SCHOOL BUILDING, DEL CARMEN NHS, DEL CARMEN, SURIGAO DEL NORTE16NG0052 · ₱442,392.03 · mapped
- CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN AT BRGY. POBLACION NORTE, SIGMA, CAPIZ, STA. 000+033 - STA. 000+10317GP0001 · ₱0.00
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →