Roads23CI0148

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION/IMPROVEMENT OF ANGELES-MAGALANG

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION/IMPROVEMENT OF ANGELES-MAGALANG is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱19,599,290.67. Status: Reported complete (DPWH). Contractor on record: NEZIAH BUILDERS AND TRADING CORP. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Quitangil River, Sta. 8+750 - Sta. 10+658 (R/S), San Agustin, Magalang, Pampanga
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Pampanga 3rd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

12 projects · ₱335.7M total · 1 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALASAS CREEK (PHASE III), BARANGAY SAN AGUSTIN, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBALEN RIVER, DOWNSTREAM OF SAPANGBALEN BRIDGE (LEFT DIKE), PHASE II, MABALACAT CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2024₱48.2M
Reported complete (DPWH)
No sat.

FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANG BALEN RIVER, DOWNSTREAM OF SAPANG BALEN BRIDGE (LEFT DIKE), PHASE I, MABALACAT CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2024₱48.2M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBALEN RIVER, SITIO PITABACAN, BARANGAY SAN ILDEFONSO, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱38.6M
Reported complete (DPWH)
No sat.

Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic to Brgy. Anunas, Angeles City, Pampanga Phase 1

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2023₱29.2M
Reported complete (DPWH)
No sat.

Repair/Improvement of Reinforced Concrete Slope Protection along Sapang Balen Creek, Sitio Pitabacan, Brgy. San Ildefonso, Magalang, Pampanga

MAGALANG (PAMPANGA), PAMPANGA, Region III

2023₱26.3M
Reported complete (DPWH)
View all 12 projects →

4. Implementation

Contract Amount

₱19,599,290.67

Progress

Reported complete (DPWH)

Start Date

June 5, 2023

Target End

October 2, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.