Flood Control and Drainage24CI0131

FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBALEN RIVER, DOWNSTREAM OF SAPANGBALEN BRIDGE (LEFT DIKE), PHASE II, MABALACAT CITY, PAMPANGA

FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBALEN RIVER, DOWNSTREAM OF SAPANGBALEN BRIDGE (LEFT DIKE), PHASE II, MABALACAT CITY, PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱48,248,804.70. Status: Reported complete (DPWH). Contractor on record: NEZIAH BUILDERS AND TRADING CORP. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-24-0002494 · ₱1,237,218 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CI0131 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-09-07 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Pampanga

Based on the coordinates published with the DPWH record and NOAH file Pampanga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBALEN RIVER, DOWNSTREAM OF SAPANGBALEN BRIDGE (LEFT DIKE), PHASE II, MABALACAT CITY, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure with Road Dike along Sabangbalen River Phase 1, Mabalacat City, Pampanga
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-24-0002494

₱1,237,218.00 · FY2024

Released to Regional Office XI - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

12 projects · ₱335.7M total · 1 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALASAS CREEK (PHASE III), BARANGAY SAN AGUSTIN, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANG BALEN RIVER, DOWNSTREAM OF SAPANG BALEN BRIDGE (LEFT DIKE), PHASE I, MABALACAT CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2024₱48.2M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBALEN RIVER, SITIO PITABACAN, BARANGAY SAN ILDEFONSO, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱38.6M
Reported complete (DPWH)
No sat.

Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic to Brgy. Anunas, Angeles City, Pampanga Phase 1

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2023₱29.2M
Reported complete (DPWH)
No sat.

Repair/Improvement of Reinforced Concrete Slope Protection along Sapang Balen Creek, Sitio Pitabacan, Brgy. San Ildefonso, Magalang, Pampanga

MAGALANG (PAMPANGA), PAMPANGA, Region III

2023₱26.3M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAPANGBATO RIVER, MARGOT, ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱24.4M
Reported complete (DPWH)
View all 12 projects →

4. Implementation

Contract Amount

₱48,248,804.70

Progress

Reported complete (DPWH)

Start Date

December 23, 2024

Target End

June 7, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.