RECHANELLING/DESILTING OF TALAVERA RIVER (SAN CARLOS ALIAGA SECTION), SAN CARLOS, ALIAGA, NUEVA ECIJA
RECHANELLING/DESILTING OF TALAVERA RIVER (SAN CARLOS ALIAGA SECTION), SAN CARLOS, ALIAGA, NUEVA ECIJA is a DPWH-tracked public work in Nueva Ecija 1st DEO, Region III. Reported contract value: ₱4,701,057.12. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST. Figures trace to dpwh.
Total Contract Cost

