CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BRGY. POBLACION ILAWOD (UPSTREAM OF GUINUTOS OVERFLOW), DUMARAO, CAPIZ
CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BRGY. POBLACION ILAWOD (UPSTREAM OF GUINUTOS OVERFLOW), DUMARAO, CAPIZ is a DPWH-tracked public work in Capiz 2nd DEO, Region VI. Reported contract value: ₱62,327,419.77. Status: Past target date (DPWH On-Going). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost



