Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 23CE0030 and 23CE0042 have near-identical descriptions about 248 m apart (funding year 2023; ₱48.99M, ₱96.49M). Worth checking whether they cover the same works. It is possible that these are adjacent or sequential segments of flood control works that were bid out as separate contracts.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Labong River, Barangay Poblacion Sur, Licab, Nueva Ecija23CE0030Flood control | 100% | September 12, 2023 | August 25, 2023 | — | completedsumbong source |
Start: February 15, 2023 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "23CE0030",
"coordinates": {
"lat": 15.543767,
"lon": 120.75669
},
"municipality": "LICAB (NUEVA ECIJA)",
"distanceMeters": 247.92903598798168,
"titleSimilarity": 1
}Source documents
