High Concurrent Workload for One Contractor
Contractor linked to many simultaneous projects or very high total value vs peers.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: G C I CONST AND DEV'T CORP holds 28 flood-control contracts worth ₱2.52B, 2.49× the 95th-percentile contractor total (₱1.01B); up to 17 ran at the same time. This is a capacity question worth examining. The contractor may have unusually high capacity or specialization in flood-control projects.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Show 22 more projects in this bucket
Rule Definition
Active project count and total value vs peer 95th percentile.
Triggering Data & citations
Contractor carries far more concurrent flood-control value than peers
{
"contractor": "G C I CONST AND DEV'T CORP",
"projectCount": 28,
"totalValuePhp": 2521444824.96,
"peerP95TotalPhp": 1014143494.4100002,
"activeProjectCount": 0,
"simultaneousThreshold": 25
}Source documents
Possible Innocent Explanations
- Large national firm with many concurrent government clients
- Data groups joint ventures under one name