Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22PE0093 was awarded at 99.92% of its ABC. Across its 16 recorded contracts, UNIVERSAL DE LEON CONST AND AGGREGATES was awarded at ≥99.5% of ABC 16 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to maximize their chances of winning while staying within legal limits.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Slope Protection at Yabyabuan Multi-Grade School, Barangay Bagong, Sablan, Benguet22PE0093 | 100% | July 14, 2023 | December 1, 2023 | — | completedsumbong source |
Start: September 7, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Benguet 1st District Engineering Office",
"ratio": 0.9992072789115646,
"abcPhp": 14700000,
"threshold": 0.995,
"contractId": "22PE0093",
"contractor": "UNIVERSAL DE LEON CONST AND AGGREGATES",
"contractCostPhp": 14688347
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate