Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22OA0008 lists a cost of ₱49.00M, 0.17% above its Approved Budget for the Contract of ₱48.92M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry or rounding error in the reported contract cost or ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Riverwall and Road Dike along Batasan River (Phase 14), Brgy. Dampalit, Malabon City22OA0008Flood control | 100% | October 11, 2022 | October 11, 2022 | — | completedsumbong source |
Start: February 14, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Malabon-Navotas District Engineering Office",
"ratio": 1.001660538326581,
"abcPhp": 48918768.51,
"threshold": 0.995,
"contractId": "22OA0008",
"contractor": "AZUL BUILDERS",
"contractCostPhp": 49000000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate