Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23E00009 was awarded at 100.00% of its ABC. Across its 23 recorded contracts, HGG BUILDERS & SUPPLY was awarded at ≥99.5% of ABC 22 times (95.7%), versus 70.4% for flood-control contracts overall. This may reflect highly competitive bidding where the winning bid closely matches the ABC.

Public record entityConstruction of Buenavista Shore Protection/Boulevard, Barangay Tungib-Lipata, Buenavista, Marinduque
LocationBUENAVISTA (MARINDUQUE), MARINDUQUE, Region IV-BContract 23E00009
Amount₱192,997,859.20100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Buenavista Shore Protection/Boulevard, Barangay Tungib-Lipata, Buenavista, Marinduque23E00009100%February 5, 2024December 15, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 11, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Marinduque District Engineering Office",
  "ratio": 0.9999889124351814,
  "abcPhp": 192999999.1,
  "threshold": 0.995,
  "contractId": "23E00009",
  "contractor": "HGG BUILDERS & SUPPLY",
  "contractCostPhp": 192997859.2
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may reflect highly competitive bidding where the winning bid closely matches the ABC.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Buenavista Shore Protection/Boulevard, Barangay Tungib-Lipata, Buenavista, Marinduque.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/10f97724-4624-47c2-961c-5e16cbf754c3

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionMarinduqueBuenavista
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault8.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.