Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: BICOL GOLDROCK CONST CORP received 27.0% (₱840.16M of ₱3.11B) of recorded flood-control contract value in Camarines Sur 1st District Engineering Office across 39 contracts and 12 contractors, at or above the 25% share threshold (HHI 0.147). This may reflect the contractor's strong track record or capacity in the area.

Public record entityBICOL GOLDROCK CONST CORPOrganization record →
LocationCamarines Sur 1st District Engineering Office
Amount₱840,157,395.7427.0% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Camarines Sur 1st District Engineering Office

Reported complete (DPWH): 11Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Libmanan Cabusao PIS Intake Slope Protection, Sipocot, Camarines Sur24FD0004Flood control100%May 1, 2024May 1, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Colacling River (Downstream), Barangay Bulawan Jr., Lupi, Camarines Sur24FD0038Flood control100%March 19, 2025August 14, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Libmanan River, Brgy. Azucena Section, Sipocot, Camarines Sur23FD0009Flood control100%November 17, 2023August 23, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Libmanan River, Brgy. Bagangan Sr. Section, Lupi, Camarines Sur23FD0010Flood control100%December 6, 2023December 5, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Libmanan River, Brgy. Cristo Rey Section, Lupi, Camarines Sur23FD0031Flood control100%December 6, 2023November 30, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Libmanan River, Brgy. Gaongan Section, Sipocot, Camarines Sur23FD0015Flood control100%December 23, 2023December 22, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Show 5 more projects in this bucket
Construction of Riverbank Protection Structure along Libmanan River, Brgy. Haluban Section, Lupi, Camarines Sur23FD0016Flood control100%November 17, 2023November 17, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Libmanan River, Brgy. Polantuna Section, Lupi, Camarines Sur23FD0024Flood control100%November 17, 2023June 26, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection Structure along Libmanan River, Brgy. South Centro Section, Sipocot, Camarines Sur23FD0017Flood control100%December 6, 2023December 5, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Sipocot River Flood Mitigation Structure (Barangay Tapi Section), Lupi, Camarines Sur24FD0003Flood control100%November 4, 2024June 25, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Mitigation Structure, Barangay Sooc, Lupi, Camarines Sur24FD0039100%March 19, 2025June 21, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.1473526751297901,
  "scope": "deo",
  "bucketKey": "deo:Camarines Sur 1st District Engineering Office",
  "contractor": "BICOL GOLDROCK CONST CORP",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 3107599140.22,
  "contractorShare": 0.27035578201393173,
  "contractorTotalPhp": 840157395.7399999,
  "contractorContracts": 11
}

Possible Innocent Explanations

  • This may reflect the contractor's strong track record or capacity in the area.

Connected records

Where this contractor works

Contractor grade B12 storms reached its projects · typhoon modeAll contractors & gradesContractor patterns