Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 6 contracts awarded to MEGAPOLITAN BUILDERS AND CONST SUPPLY by the same office started within 18 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 6 in the same municipality. It is possible that these are separate projects planned for different locations or phases within the same municipality.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Revetment along Tributary of Diappa Creek, Downstream of Diappa Bridge (Phase II), Batac City, Ilocos Norte22A00165 | 100% | September 11, 2022 | July 15, 2022 | β | completedsumbong source |
Start: March 25, 2022 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Ilocos Norte 2nd District Engineering Office",
"contractId": "22A00165",
"contractor": "MEGAPOLITAN BUILDERS AND CONST SUPPLY",
"windowDays": 120,
"clusterSize": 6,
"thresholdPhp": 50000000,
"contractCostPhp": 48250000,
"averageTitleSimilarity": 0.8823524253042321
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program