Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22LB0122 was awarded at 100.00% of its ABC. Across its 29 recorded contracts, GENESIS88 CONST INC was awarded at ≥99.5% of ABC 29 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or a single qualified bidder submitting a bid at the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Revetment along Panacan River, Sta. 1+400 - Sta. 1+700, South Side, Right Bank, Davao City22LB0122 | 100% | February 26, 2023 | February 26, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: April 7, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Davao City District Engineering Office",
"ratio": 1,
"abcPhp": 67550000,
"threshold": 0.995,
"contractId": "22LB0122",
"contractor": "GENESIS88 CONST INC",
"contractCostPhp": 67550000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to precise cost estimation or a single qualified bidder submitting a bid at the ABC.
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Revetment along Panacan River, Sta. 1+400 - Sta. 1+700, South Side, Right Bank, Davao City.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/1470f277-c75e-4717-a720-565af15220a4
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.
