Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23BH0231 was awarded at 100.00% of its ABC. Across its 36 recorded contracts, DALCON CONST was awarded at ≥99.5% of ABC 35 times (97.2%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding or precise cost estimation.

Public record entityConstruction of Cabaruan, Drainage System Project, Cabaruan, Cauayan City, Isabela
LocationCITY OF CAUAYAN (ISABELA), ISABELA, Region IIContract 23BH0231
Amount₱48,915,964.67100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Cabaruan, Drainage System Project, Cabaruan, Cauayan City, Isabela23BH0231Flood control100%September 14, 2024September 23, 2024—completedsumbong source

Start: September 4, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 4th District Engineering Office",
  "ratio": 0.9999992777414344,
  "abcPhp": 48916000,
  "threshold": 0.995,
  "contractId": "23BH0231",
  "contractor": "DALCON CONST",
  "contractCostPhp": 48915964.67
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding or precise cost estimation.