Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22IE0059 and 22IE0060 have near-identical descriptions at the same coordinates (funding year 2022; ₱4.80M, ₱4.80M). Worth checking whether they cover the same works. It is possible that the first contract was simply not labeled as a phase, and these are sequential phases of the same project.

Public record entityConstruction of Flood Control, Barangay Cristina, Calubian Leyte
LocationCALUBIAN (LEYTE), LEYTE, Region VIIIContract 22IE0059
Amount₱4,801,994.29 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control, Barangay Cristina, Calubian Leyte22IE0059Flood control100%July 27, 2022July 27, 2022—completedsumbong source

Start: March 25, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Identical coordinates shared by multiple contracts

{
  "contractId": "22IE0059",
  "coordinates": {
    "lat": 11.44917,
    "lon": 124.42604
  },
  "otherContracts": [
    "22IE0060"
  ]
}

Possible Innocent Explanations

  • Multi-component contracts sharing a single pin
  • GIS centroid placement