Low-Graded DPWH Contractor Winning DepEd/DOH Works
A contractor with a D or F record grade on this site won DepEd/DOH infrastructure awards.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: RL EARTH HAULING & EQUIPMENT SERVICES INC., which has a record grade of D on this site (a summary of public data on 10 DPWH projects, not a government blacklist), won 1 DepEd/DOH infrastructure award worth ₱71,700. A low record grade may reflect project delays or issues that have since been resolved.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|
Rule Definition
Exact name match between the graded organisation and the PhilGEPS awardee. Grades summarise public DPWH project data.
Triggering Data & citations
RL EARTH HAULING & EQUIPMENT SERVICES INC., which has a DPWH record grade of D on this site (based on 10 DPWH projects), won 1 DEPED infrastructure awards worth ₱71,700.
{
"grade": "D",
"awards": [
{
"url": "/agency-awards/e6ff52a8-16cf-4047-b9c9-195f79e4b611",
"title": "Ground/Surface Levelling of DepEd DIvision Office",
"office": "DEPARTMENT OF EDUCATION - DIVISION OF BOHOL",
"awardId": "e6ff52a8-16cf-4047-b9c9-195f79e4b611",
"awardee": "RL EARTH HAULING & EQUIPMENT SERVICES INC.",
"amountPhp": 71700,
"awardDate": "2018-02-13",
"referenceId": "2018-02-028",
"businessCategory": "Construction Projects"
}
],
"totalPhp": 71700,
"gradeScore": 68.9,
"dpwhProjects": 10,
"contractorUrl": "/organizations/654f50d6-2581-4972-83a2-a870ac18ad5e"
}Source documents
Possible Innocent Explanations
- The record grade summarises public DPWH project data (delays, flags) and is not a disqualification; agencies may have had no blacklist basis to exclude the contractor.
- A low record grade may reflect project delays or issues that have since been resolved.