Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CC0403 was awarded at 100.00% of its ABC. Across its 15 recorded contracts, TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC was awarded at ≥99.5% of ABC 15 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor consistently bids at the maximum allowed amount to maximize revenue within legal limits.

Public record entityConstruction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Bambang (Sitio Pulo To Purok 6), Bocaue, Bulacan
LocationBOCAUE (BULACAN), BULACAN, Region IIIContract 24CC0403
Amount₱98,999,012.87100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction/Improvement of Slope Protection Structure and Waterways along Bocaue River, Brgy. Bambang (Sitio Pulo To Purok 6), Bocaue, Bulacan24CC0403100%January 17, 2025January 17, 2025No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 23, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 1st District Engineering Office",
  "ratio": 0.9999923472549862,
  "abcPhp": 98999770.49,
  "threshold": 0.995,
  "contractId": "24CC0403",
  "contractor": "TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC",
  "contractCostPhp": 98999012.87
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanBocaue
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault21.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated only at SSA4 (>5 m surge)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.