Cross-Source Mismatch (PhilGEPS vs DPWH)

Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: PhilGEPS award 22JA0038 lists ₱4.46M to TERRAINSHAPER CONSTRUCTION AND ENTERPRISES, while DPWH records contract 22JA0038 at ₱4.80M to TERRAINSHAPER CONST AND ENT. The contract amount may have increased after the initial award, which is a common occurrence.

Public record entityConstruction of Drainage System at Barangay Guiwan, Zamboanga City, Zamboanga del Sur
LocationZAMBOANGA CITY (ZAMBOANGA DEL SUR), ZAMBOANGA DEL SUR, Region IXContract 22JA0038
Amount₱4,801,870.31 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Drainage System at Barangay Guiwan, Zamboanga City, Zamboanga del Sur22JA0038100%October 19, 2022October 19, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 23, 2022 · Source fetched October 21, 2026

Rule Definition

Compares linked award and project contractor/cost above tolerance.

Triggering Data & citations

Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record

{
  "linkId": "9e0ea861-1acd-4e14-8fc7-e3360a0b054f",
  "awardId": "1cb10949-4a52-4e5a-ac68-3abe79168fb6",
  "linkScore": 1,
  "nameMismatch": false,
  "amountMismatch": true,
  "awardAmountPhp": 4455631.31,
  "linkValidation": "philgeps_ref equals DPWH contract ID",
  "projectCostPhp": 4801870.31,
  "philgepsAwardee": "TERRAINSHAPER CONSTRUCTION AND ENTERPRISES"
}

Cite this record

Love the Philippines. “Cross-Source Mismatch (PhilGEPS vs DPWH) (X-source): Construction of Drainage System at Barangay Guiwan, Zamboanga City, Zamboanga del Sur.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/2d84179b-7d15-41e3-981f-b046a5867d70

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)City of ZamboangaGuiwan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault10.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.