Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22E00146 lists a cost of ₱74.20M, 2.53% above its Approved Budget for the Contract of ₱72.37M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-bid contract adjustment not reflected in the ABC field.

Public record entityConstruction of España Flood Control Structure (Phase 2), Brgy España, San Fernando, Romblon
LocationSAN FERNANDO (ROMBLON), ROMBLON, Region IV-BContract 22E00146
Amount₱74,202,417.84102.53% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of España Flood Control Structure (Phase 2), Brgy España, San Fernando, Romblon22E00146Flood control100%June 9, 2023July 14, 2023—completedsumbong source

Start: September 13, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Romblon District Engineering Office",
  "ratio": 1.0252502228823777,
  "abcPhp": 72374934.61,
  "threshold": 0.995,
  "contractId": "22E00146",
  "contractor": "LEGACY CONST CORP FORMERLY: LEGACY CONST",
  "contractCostPhp": 74202417.84
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a post-bid contract adjustment not reflected in the ABC field.