Indicator: Mountain Province 1st District Engineering Office awarded 22 of 22 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 4.4e-04), across 18 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This may reflect a local practice of awarding contracts at the maximum allowed bid price to ensure project completion or due to limited competition.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Mountain Province 1st District Engineering Office: contracts
22 of 22 contracts (100%) at β₯99.5% of ABC Β· peer baseline 70.4% Β· gap +29.6 pts Β· binomial p = 4.4e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 24PI0050 | Construction of Flood Mitigation Structure protecting Public InfraStructure/Facilities, Barangay Mainit, Bontoc, Mountain Province | YCHONGLIYAN CONST | 100.00% | DPWH |
| 22PI0017 | Construction of Flood Control, Barangay Mainit, Bontoc, Mountain Province | YCHONGLIYAN CONST | 100.00% | DPWH |
| 24PI0001 | Construction of Kawayan-Kamiling-Padang Otucan Norte Flood Control along Bayudan-Chico River, Bauko, Mountain Province | MG SAMIDAN CONST / LOG-AKA CONST | 100.00% | DPWH |
| 22PI0043 | Construction of Wawang Flood Control Structure, Sta. 32 + 180 - Sta. 32 + 250 (L.S.), Sta. 32 + 184 - Sta. 32 + 264 (R.S.), Sta. 32 + 328 - Sta. 32 + 358 (L.S.) | SADLAN CONST | 100.00% | DPWH |
| 22PI0050 | Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain Province | MG SAMIDAN CONST / R S SEPIAN CONST & TRUCKING | 100.00% | DPWH |
| 24PI0026 | Construction of Supang Flood Control, Bisibisan Section along Bayudan-Chico River, Sabangan, Mountain Province | DD LIKIGAN CONST | 100.00% | DPWH |
| 22PI0066 | Construction of Bonon Flood Control Structure, Sta. 31+ 380 - Sta.31+460 (LS) along Talubin River, Bontoc, Mountain Province | DHEN'Z CONST | 100.00% | DPWH |
| 23PI0010 | Construction of Abit Flood Control along Abit River, Tadian, Mountain Province | FJ MIRANDA CONST | 100.00% | DPWH |
| 23PI0071 | Construction of Flood Control Mitigation Structure, Ligab-Sumbagan along Chico River, Gonogon, Bontoc, Mountain Province | ALPHA SIX CONST | 100.00% | DPWH |
| 24PI0009 | Construction of Gayang Flood Control along Chico River, Sabangan, Mountain Province | FJ MIRANDA CONST | 100.00% | DPWH |
| 23PI0002 | Construction of Chico River Flood Control, Tamog-o Section at Sitio Tamog-o in Barangay Monamon Norte, Bauko, Mountain Province | OLSIM CONST / RODEKOM GEN CONST AND ENT | 100.00% | DPWH |
| 24PI0010 | Construction of Monamon Norte Flood Control along Chico River, Panas Section, Bauko, Mountain Province | OLSIM CONST / GELLE CONST SERVICES | 100.00% | DPWH |
| 23PI0072 | Construction of Flood Control Mitigation Structure, Sao-Malitep along Chico River, Balili, Bontoc, Mountain Province | JBA CONST AND BUILDERS | 100.00% | DPWH |
| 22PI0023 | Construction of Chico-Karayan-Tikitik Flood Control Structure, Sta. 29+000 - Sta. 29+760 (LS) along Chico River, Bontoc, Mountain Province | JBA CONST AND BUILDERS | 100.00% | DPWH |
| 23PI0032 | Construction of Balili Flood Control, Sta. 39 + 550 - Sta. 39 + 830 (LS); Sta. 40 + 120 - Sta 40 + 270 (LS) along Chico River, Bontoc, Mountain Province | CHAO-MING CONST SERVICES / E T LATAWAN CONST | 100.00% | DPWH |
| 23PI0080 | Construction of Caluttit-Pakkil Flood Control, Sta. 28 + 242 - Sta. 28 + 440 (LS) along Chico River, Bontoc, Mountain Province | A I P CONST / LEWIN VANNE GEN ENGINEERING AND CONST | 100.00% | DPWH |
| 21PI0052 | Construction of Chaksu Flood Control; Sta. 30 + 580 - Sta. 30 + 840 (L.S.), Sta. 30+880 - Sta. 30+910 along Chico River, Bontoc, Mountain Province | AFEW CONST / E T LATAWAN CONST | 100.00% | DPWH |
| 21PI0014 | Construction of Magatiley Flood Control; Sta. 67 +225 - Sta. 67 + 900 (R.S.) along Chico River, Bauko, Mountain Province | 3K ROCK ENGINEERING / OLSIM CONST | 100.00% | DPWH |
| 23PI0001 | Construction of Monamon Sur and Monamon Norte Flood Control, Bebe-Saew Section, Sta. 70 + 440 - Sta. 71 + 540 (RS) along Chico River, Bauko, Mountain Province | OLSIM CONST / RODEKOM GEN CONST AND ENT | 100.00% | DPWH |
| 22PI0038 | Construction of ABIT Flood Control along Abit River, Tadian, Mountain Province | OLSIM CONST / BALLIGI CONST DEVELOPMENT CORP FORMERLY:BALLIGI CONST / RODEKOM GEN CONST AND ENT | 100.00% | DPWH |
| 21PI0033 | Construction of Agkuyu-Chico River Flood Control; Sta. 30 + 720 - Sta. 31 + 260 (L.S.), Sta. 30+710 - Sta. 30+770 (R.S.), Barangay Samoki, Bontoc, Mountain Prov | ED1SON DEVELOPMENT & CONST INC / KOMICHOV GEN CONST | 100.00% | DPWH |
| 23PI0093 | Construction of Fengar Flood Control, Sta. 33 + 220- Sta. 33 + 470 (RS) along Agkuyo-Chico River, Bontoc, Mountain Province | KOMICHOV GEN CONST | 100.00% | DPWH |
Named in this indicator? Respond or report an error Β· Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC β₯ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Mountain Province 1st District Engineering Office",
"nearAbc": 22,
"trigger": "office_pattern_aggregate",
"officeId": "f0c43d0c-55ea-5bbe-96ca-6cf170ed3c70",
"threshold": 0.995,
"binomialTailP": 0.00044331116729167536,
"nearAbcRatePct": 100,
"totalContracts": 22,
"baselineRatePct": 70.4,
"excessPctPoints": 29.6,
"expectedNearAbc": 15.5,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at β₯99.5% of ABC"
}Source documents