Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 5 contracts awarded to 729 CONST INC FORMERLY 722 CONST INC by the same office started within 107 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 5 in the same municipality. It is possible these are separate projects in different locations within Marikina City, each addressing distinct drainage or flood control needs.

Public record entityConstruction of Drainage System, Brgy. Tumana, Marikina City
LocationCITY OF MARIKINA (METROPOLITAN MANILA), MARIKINA CITY, National Capital RegionContract 23OB0403
Amount₱46,727,916.11 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Drainage System, Brgy. Tumana, Marikina City23OB0403100%December 16, 2023December 16, 2023—completedsumbong source

Start: March 22, 2023 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Metro Manila 1st District Engineering Office",
  "contractId": "23OB0403",
  "contractor": "729 CONST INC FORMERLY 722 CONST INC",
  "windowDays": 120,
  "clusterSize": 5,
  "thresholdPhp": 50000000,
  "contractCostPhp": 46727916.11,
  "averageTitleSimilarity": 0.8009518371820326
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program