Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 10 contracts awarded to VILLAR GEN CONST AND SUPPLIES by the same office started within 57 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 6 in the same municipality. It is possible that these are separate flood control projects in different barangays, planned together for efficiency.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure, Barangay San Fermin, Caba, La Union24AF0043Flood control | 100% | August 30, 2024 | March 16, 2025 | — | completedsumbong source |
Start: February 16, 2024 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold in one municipality
{
"deo": "La Union 2nd District Engineering Office",
"contractId": "24AF0043",
"contractor": "VILLAR GEN CONST AND SUPPLIES",
"windowDays": 120,
"clusterSize": 10,
"thresholdPhp": 50000000,
"contractCostPhp": 48995000,
"maxInOneMunicipality": 6