Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22EH0032 was awarded at 100.00% of its ABC. Across its 115 recorded contracts, LEGACY CONST CORP FORMERLY: LEGACY CONST was awarded at ≥99.5% of ABC 100 times (87.0%), versus 70.4% for flood-control contracts overall. Contractors may bid at the maximum allowed amount to ensure project viability or due to tight cost estimates.

Public record entityConstruction of Agbunyog Flood Control along Tablas Circumferential Road (B/S), Sta. 0+271 - Sta. 0+698 (R/S), Sta. 0+470 - Sta. 0+510 (L/S), Sta. 0+525 - Sta. 0+700 (L/S), Sta. Maria, Romblon
LocationSANTA MARIA (IMELDA) (ROMBLON), ROMBLON, Region IV-BContract 22EH0032
Amount₱96,013,026.19100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0

Start: June 3, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Romblon District Engineering Office",
  "ratio": 0.9999534132837117,
  "abcPhp": 96017499.33,
  "threshold": 0.995,
  "contractId": "22EH0032",
  "contractor": "LEGACY CONST CORP FORMERLY: LEGACY CONST",
  "contractCostPhp": 96013026.19
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate