Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24HL0013 and 23HL0005 have near-identical descriptions about 211 m apart (funding years 2023, 2024; ₱45.08M, ₱44.10M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or expansion of the previous year's work, but this is not labeled in the titles.

Public record entityRehabilitation of River Control along Siaton River, Upstream A, Barangay Datag, Siaton, Negros Oriental
LocationSIATON (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VIIContract 24HL0013
Amount₱45,080,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of River Control along Siaton River, Upstream A, Barangay Datag, Siaton, Negros Oriental24HL0013Flood control100%September 11, 2024July 16, 2024—completedsumbong source

Start: February 20, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24HL0013",
  "fundingYear": 2024,
  "municipality": "SIATON (NEGROS ORIENTAL)",
  "distanceMeters": 211.4047506764259,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately