Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22LB0350 was awarded at 100.00% of its ABC. Across its 29 recorded contracts, GENESIS88 CONST INC was awarded at ≥99.5% of ABC 29 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the bid was calculated to exactly match the ABC, which is allowed but uncommon.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Right Bank, Talomo River, Davao City22LB0350Flood control | 100% | May 22, 2023 | April 28, 2023 | — | completedsumbong source |
Start: April 13, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Davao City District Engineering Office",
"ratio": 1,
"abcPhp": 86850000,
"threshold": 0.995,
"contractId": "22LB0350",
"contractor": "GENESIS88 CONST INC",
"contractCostPhp": 86850000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
