Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23CC0280 lists a cost of ₱74.25M, 1.02% above its Approved Budget for the Contract of ₱73.50M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-award contract variation that was not reflected in the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Project and Rehabilitation of Waterways along Angat River Brgy. Parulan Plaridel, Bulacan23CC0280Flood control | 100% | December 21, 2023 | December 21, 2023 | — | completedsumbong source |
Start: March 27, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Bulacan 1st District Engineering Office",
"ratio": 1.010192617793921,
"abcPhp": 73499946.25,
"threshold": 0.995,
"contractId": "23CC0280",
"contractor": "DOUBLE 12 CONST & SUPPLY",
"contractCostPhp": 74249103.11
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to a data entry error or a post-award contract variation that was not reflected in the ABC.