Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22OA0031 lists a cost of ₱9.79M, 0.48% above its Approved Budget for the Contract of ₱9.75M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-bid adjustment that was not reflected in the ABC field.

Public record entityConstruction of Box-Culvert Drainage along C. Arellano St. (Sigwa St. to Sacristia Pumping Station), Malabon City
LocationCITY OF MALABON (METROPOLITAN MANILA), MALABON CITY, National Capital RegionContract 22OA0031
Amount₱9,793,953.08100.49% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Box-Culvert Drainage along C. Arellano St. (Sigwa St. to Sacristia Pumping Station), Malabon City22OA0031100%July 3, 2023July 3, 2023—completedsumbong source

Start: February 14, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Malabon-Navotas District Engineering Office",
  "ratio": 1.0048543077957095,
  "abcPhp": 9746639.89,
  "threshold": 0.995,
  "contractId": "22OA0031",
  "contractor": "AL-REM KONSTRUCT INC",
  "contractCostPhp": 9793953.08
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a post-bid adjustment that was not reflected in the ABC field.