Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 22NG0055 and 22NG0022 have near-identical descriptions about 1145 m apart (funding year 2022; ₱9.90M, ₱48.49M). Worth checking whether they cover the same works. It is possible these are separate segments of the river or phases not labeled in the titles.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Magtiaco River Flood Control along Magtiaco River, Barangay San Pedro, Alegria, Surigao del Norte22NG0055Flood control | 100% | December 10, 2022 | December 9, 2022 | — | completedsumbong source |
Start: April 1, 2022 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "22NG0055",
"fundingYear": 2022,
"municipality": "ALEGRIA (SURIGAO DEL NORTE)",
"distanceMeters": 1144.5737516642164,
"titleSimilarity": 1
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately