Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23DQ0068 was awarded at 99.97% of its ABC. Across its 21 recorded contracts, GRAIA CONST CORP was awarded at ≥99.5% of ABC 21 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to remain competitive in tight bidding environments.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of River Bank Protection Works along Zapote River at Brgy Molino, Bacoor City, Cavite23DQ0068Flood control | 100% | March 25, 2024 | February 16, 2024 | — | completedsumbong source |
Start: May 1, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Cavite 3rd District Engineering Office",
"ratio": 0.9997358336660352,
"abcPhp": 98999935.41,
"threshold": 0.995,
"contractId": "23DQ0068",
"contractor": "GRAIA CONST CORP",
"contractCostPhp": 98973782.96
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate