Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24CD0029 and 23CD0083 have near-identical descriptions about 85 m apart (funding years 2023, 2024; ₱4.95M, ₱4.88M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or expansion of the first, or covers a different aspect (such as slope protection) of the same site.

Public record entityConstruction of Flood Control Structure (Slope Protection), Brgy. Bahay Pare, Meycauayan City, Bulacan
LocationCITY OF MEYCAUAYAN (BULACAN), BULACAN, Region IIIContract 23CD0083
Amount₱4,875,393.12 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure (Slope Protection), Brgy. Bahay Pare, Meycauayan City, Bulacan23CD0083100%July 18, 2023July 18, 2023—completedsumbong source

Start: March 30, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23CD0083",
  "fundingYear": 2023,
  "municipality": "CITY OF MEYCAUAYAN (BULACAN)",
  "distanceMeters": 85.2094660804713,
  "titleSimilarity": 0.9126467331118494
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately