Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: BPQ CONST AND TRADING / POLYMER-VIC CONST received 28.9% (₱382.92M of ₱1.33B) of recorded flood-control contract value in Bataan 2nd District Engineering Office across 23 contracts and 12 contractors, at or above the 25% share threshold (HHI 0.115). This may be due to the contractor's strong track record or specialization in flood-control projects in the area.

Public record entityBPQ CONST AND TRADING / POLYMER-VIC CONSTOrganization record →
LocationBataan 2nd District Engineering Office
Amount₱382,920,000.0028.9% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Bataan 2nd District Engineering Office

Reported complete (DPWH): 9Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Abo-abo River (Upstream) City of Balanga, Bataan23CB0020Flood control100%September 9, 2023June 26, 2023—completedsumbong source
Construction of Flood Control Structure along Mamala River, Limay, Bataan24CB0008Flood control100%November 17, 2024November 15, 2024—completedsumbong source
Construction of Flood Control Structure along Pandam River, Orion, Bataan24CB0019Flood control100%September 3, 2024September 3, 2024—completedsumbong source
Construction of Flood Control Structure along Talisay River (9+087- 9+385), Balanga City, Bataan24CB0036Flood control100%October 4, 2024October 10, 2024—completedsumbong source
Construction of Flood Control Structure along Talisay River (9+385-9+810), Balanga City, Bataan24CB0039Flood control100%September 15, 2024September 13, 2024—completedsumbong source
Construction of Flood Control Structure along Talisay River, (6+164 - 6+369), Pilar, Bataan23CB0027Flood control100%January 5, 2024December 27, 2023—completedsumbong source
Show 3 more projects in this bucket

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.11476285020118226,
  "scope": "deo",
  "bucketKey": "deo:Bataan 2nd District Engineering Office",
  "contractor": "BPQ CONST AND TRADING / POLYMER-VIC CONST",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 1326492709.79,
  "contractorShare": 0.28867101731800765,
  "contractorTotalPhp": 382920000,
  "contractorContracts": 9
}

Possible Innocent Explanations

  • This may be due to the contractor's strong track record or specialization in flood-control projects in the area.