Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 3 contracts awarded to R R RICAFORT CONST AND SUPPLIES by the same office started within 0 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. These may be separate legitimate projects for different sections of the river, each requiring its own contract.

Public record entityConstruction of Slope Protection along Camiling River Right Bank, Surgui 1st Section, Surgui 1st, Camiling, Tarlac
LocationCAMILING (TARLAC), TARLAC, Region IIIContract 22CJ0022
Amount₱43,210,090.76 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection along Camiling River Right Bank, Surgui 1st Section, Surgui 1st, Camiling, Tarlac22CJ0022100%July 22, 2022July 22, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: January 28, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Tarlac District Engineering Office",
  "contractId": "22CJ0022",
  "contractor": "R R RICAFORT CONST AND SUPPLIES",
  "windowDays": 120,
  "clusterSize": 3,
  "thresholdPhp": 50000000,
  "contractCostPhp": 43210090.76,
  "averageTitleSimilarity": 0.8960128168445555
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacCamilingSurgui 1st
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault7.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.