Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23G00018 was awarded at 100.00% of its ABC. Across its 22 recorded contracts, IBC INTERNATIONAL BUILDERS CORP was awarded at ≥99.5% of ABC 21 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or highly competitive bidding.

Public record entityConstruction of Slope Protection Structure (Rockfall Netting) along Panay East-West Lateral Road Package 1, Iloilo
LocationILOILO CITY (CAPITAL) (ILOILO), ILOILO, Region VIContract 23G00018
Amount₱142,337,500.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection Structure (Rockfall Netting) along Panay East-West Lateral Road Package 1, Iloilo23G00018100%March 20, 2024March 20, 2024—completedsumbong source

Start: February 7, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Iloilo 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 142337500,
  "threshold": 0.995,
  "contractId": "23G00018",
  "contractor": "IBC INTERNATIONAL BUILDERS CORP",
  "contractCostPhp": 142337500
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to precise cost estimation or highly competitive bidding.