Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22LB0373 was awarded at 100.00% of its ABC. Across its 29 recorded contracts, GENESIS88 CONST INC was awarded at ≥99.5% of ABC 29 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding or precise cost estimation.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure at Purok 16, Block 2, Barangay Catalunan Pequeño, Davao City22LB0373Flood control | 100% | July 27, 2023 | July 27, 2023 | — | completedsumbong source |
Start: April 13, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Davao City District Engineering Office",
"ratio": 1,
"abcPhp": 6860000,
"threshold": 0.995,
"contractId": "22LB0373",
"contractor": "GENESIS88 CONST INC",
"contractCostPhp": 6860000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to highly competitive bidding or precise cost estimation.
