Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23KA0046 and 24KA0032 have near-identical descriptions about 433 m apart (funding years 2023, 2024; ₱57.90M, ₱96.50M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or extension of the first phase, or covers a different segment not specified in the titles.

Public record entityConstruction of Flood Mitigation Structure along Bobonawan River, barangay Cabulohan, Cabanglasan, Bukidnon
LocationCABANGLASAN (BUKIDNON), BUKIDNON, Region XContract 24KA0032
Amount₱96,499,793.05 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Bobonawan River, barangay Cabulohan, Cabanglasan, Bukidnon24KA0032Flood control100%October 26, 2024August 20, 2024—completedsumbong source

Start: January 31, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24KA0032",
  "fundingYear": 2024,
  "municipality": "CABANGLASAN (BUKIDNON)",
  "distanceMeters": 433.24856835315774,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately